Subfloor Prep For Floating Floor

To make a subfloor suitable for installing laminate check out this basic guide first.
Subfloor prep for floating floor. If you have a concrete floor you must use a self leveling compound to level the floor out. Use a long level and tape measure to check that the floor is level. It supports your decorative floor finish whether it s carpet hardwood vinyl laminate or tile. Preparation for installing floor tile depends on the type of subfloor in the room you are tiling.
The first step to proper installation is to get the subfloor in order. First assess the severity of the uneven subfloor. If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins. How to prepare a subfloor for vinyl flooring.
For more information download our pdf about types of subfloors. A subfloor is the bottom most structural level of your floor. Sheet vinyl flooring provides a durable surface for high traffic areas in your home. To help you start your installation project off right here are a few tips for preparing your subfloor.
Typically the floor must be level and uniform within 3 16 inch every 10 feet. If you have a wood floor you can follow the same process. Vinyl is one of the few types of floors that can be safely installed over concrete wood or other solid floors. Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
When installing new resilient tile such as premium excelon vct and standard excelon vct armstrong flooring allows the use of s 89 s 515 s 700 and s 750 resilient tile adhesives over old adhesive residue as long as the adhesive residue has no ridges or puddles evident and what remains is a thin smooth film. If you are installing a locking or floating floor not attached to the subfloor just make sure that the subfloor is clean. Can i install a new floor covering over old adhesive residue. Thoroughly vacuum the existing floor and use a long floor leveler and tape measure to ensure the subfloor is level within 3 16 inch for every 10 feet.